WEEKLY UPDATES
October
26-November 2
Plote Construction
completed clean up and punchlist items for all construction work on
Cherry Lane. Thanks to all residents for your patience during this
construction season and we hope that you are all pleased with the
finished product.



October
19-October 25
The striping for Cherry
Lane has been completed for Cherry Lane. The striping includes all
center line and edge line striping. All crosswalks and stop bars were
included as well. The remaining shared bike lane symbols are to be
installed at a later date.
October
12-October 18
The final asphalt
surface course was completed for Cherry Lane between Landwehr Road and
Greenbriar Lane. Plote Construction completed the remaining punchlist
items for the project and final regrading and reseeding of all parkways
has been completed.
October 5 - October 12
Plote
construction continued work on punch list items including various
underground storm sewer modifications and the replacement of curb. All
preparation work for paving of the surface course has been completed and
paving of the asphalt surface course is anticipated to commence on
Wednesday, October 15.
September 28 - October 4
Plote
Construction completed the grinding of butt joints and the binder
course. The contractor continued the completion of punch list items for
the completion of the project. This included the completion of brick
paver installation in the bump outs east of Western Ave. and some
limited landscaping work.
May 2008
June
2008
July
2008
August
2008
September 2008
2007 Weekly Updates
PROJECT DESCRIPTION
This
project generally consists of the pavement reconstruction of Cherry Lane
from Landwehr Road to Greenbriar Lane and Western Avenue from Walters
Avenue to Dundee Road. The pavement reconstruction includes new full
depth bituminous pavement, new concrete curb and gutter, partial
sidewalk removal and replacement, and topsoil/seeding parkway
restoration. The existing roadways section will generally be maintained
which includes two thru travel lanes and a parallel parking lane on both
sides of the thru lanes. Curb and gutter/pedestrian “bump outs” will be
constructed at various intersections. These “bump outs” will serve as
traffic calming devices as well as reducing the in-road travel distance
for pedestrian crossing the street.
PROJECT CONTACTS
Resident Engineer
Kevin Wilson, P.E.
Christopher B. Burke
Engineering, Ltd.
Cell: 847-291-9135
EXHIBITS
None at this time.
RESIDENT NOTIFICATIONS
None at this time.
|