CBBEL designed and prepared Contract Documents for the decommissioning and demolition of an existing potable water pressure adjusting station. The existing station was replaced with a 60’ x 68’ pressure adjusting station with storage room, three vehicle garage, pressure adjusting room, laboratory, washroom and mechanical room. Building and site improvements included a sodium hypochlorite water treatment system; natural gas standby generators; building lighting, HVAC and plumbing; and storm sewer and sanitary sewer improvements.

The Details

Location

Lombard, Illinois

Construction Cost/Fee

$2.5 million/$220,000

Client

Village of Lombard